Three phase closed I-P link energy meter test bench, type KP-S3016-B, is designed for testing three-phase energy meters, especially for testing Closed I-P Links three-phase energy meters. It is an ideal testing equipment for energy meter factory or R&D institute. All the testing procedures can be automatically operated by PC or by Keyboard manually.
MAIN TECHNICAL 1.Specification of phantom load power source: Power and consumption: Power supply: 1P2W 220V/240V ¡À10%, 50Hz or 60Hz; Or (3P4W 3x220V/240V ¡À10%) Max consumption: 1800VA (8 meter positions)
2.Current source: Output current: 3¡Á0.001A-3¡Á100A Adjusting resolution: 0.01% (min. 0.0001A) Power factor: 0~3600; resolution: 0.10 Output frequency: 45Hz~65Hz; THD(sine wave output): <0.8% Stability of current during sine wave output: 0.05% (180s) Output wave: sine wave 2-21 harmonic wave, total should be less than 40% Odd harmonic waveform Sub harmonic waveform Output capacity: 50VA per meter position 3.Voltage source: Load: the Load can be resistor / inductive / capacitive(<4uF) Adjusting resolution: 0.01% (min. 0.1V) Output frequency: 45Hz~65Hz; THD (sine wave output): <0.8% Voltage stability of power source during sine wave output: 0.05% (180s) Output wave: sine wave 2-21 harmonic wave, total should be less than 40% Output capacity: 20VA per meter position
|